IFMA Logo

Work breakdown structure (WBS)

A graphical method of dividing a project’s deliverables and work into manageable or logical subdivisions so the project scope can be defined and the required work can be understood and assigned. A hierarchy that branches out from the general to the specific and can be presented as an indented list or in a graphical format.